曾工致力于各类电子电器产品的国际国内认证、EMC整改,欢迎各位询价,提供专业服务,解决客户痛点!专治各种产品不合格!
电话:139 2899 3907 邮箱info@emc.wiki

EN 61000-4-4:2012

来自认证百科
Admin讨论 | 贡献2020年4月23日 (四) 21:45的版本

EN 61000-4-4:2012

电磁兼容性(EMC)-第4-4部分:测试和测量技术-电气快速瞬变/突发抗扰度测试

Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test

测试等级

EFT test levels (IEC/EN 61000-4-4)
Power ports, earth ports (PE)
Level Voltage peak (kV) Repetition frequency (kHz)
1 .5 kV 5 or 100 kHz
2 1 kV 5 or 100 kHz
3 2 kV 5 or 100 kHz
4 4 kV 5 or 100 kHz
x special special
x can be any level specified in product specific standards

生效日期

date of Ratification (DOR) (1) 2012-06-04 date of Availability (DAV) (2) 2012-11-09 date of Announcement (DOA) (3) 2012-09-04 date of Publication (DOP) (4) 2013-05-09 date of Withdrawal (DOW) (5) 2015-06-04 EN-61000-4-4-2012.jpg

Note: (1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved

(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat

(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level

(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement

(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn

(6) This list of normative references is purely indicative. The only official list of normative references is the list of the published standard.

In the case of undated standard, a link to the last dated version is provided.

In the case of series, a link to each standard identified in the series is provided.

We also invite you to check (via the website) whether corrigenda and/or amendments shall be read in conjunction with the main standard.

(7) Estimated dates to be confirmed at the publication of the standards.